Condensed from our full Trakhees structural approval guide โ particularly relevant for Palm Jumeirah, Jebel Ali and Dubai Investment Park projects.
- Plot lease or ownership document issued by Trakhees
- Structural drawings prepared to Trakhees' format, stamped by a Trakhees-approved consultant
- Structural calculations matched to the drawings, on a code basis confirmed for the specific zone
- Declared building use matched precisely to the load assumptions in the calculations
- Racking and plant load data included for warehouse/industrial submissions
This checklist is a preparation aid, not professional advice for a specific project โ every project should still be reviewed individually.