This condenses our full Dubai Municipality structural approval guide into a pre-submission checklist. It's a preparation aid, not a substitute for professional review of your specific project.
- Title deed or ownership document
- Applicant/owner Emirates ID
- Existing approved drawings, where the property has them
- Structural drawings stamped by a DM-approved consultant
- Structural calculations using a consistent design code basis, matched exactly to the drawings
- Geotechnical justification for any foundation assumptions
This checklist is a preparation aid, not professional advice for a specific project โ every project should still be reviewed individually.